LLP "KOSTANАY ZHOLDARY"
The «Kostanay Zholdary» limited liability partnership is a part of the largest Kazakhstan road-constriction Holding «Aytei Group Company» «Kostanay Zholdary» formed in 1993, is the legal successor of the Kostanay Regional Production Directorte of roads. The structure of «Kostanay Zholdary» includes 3 road branches: Kostanay, Zatobolsk, Medykarinsk.
The main business activities of Kostanay Zholdary are:
Reconstruction, capital, middle and routine repairs, as well as the maintenance and management of roads
Production of bitumen concrete mixes, black crushed stone
Road signs production
The enterprise has the following production facilities:
- modern road-construction laboratory;
- road signs production workshop.
During the works, advanced road construction technology and modern high-performance equipment are used: bitumen paving machine, recyclers, pulverizing mixer, asphalt compactors, excavators, mechanical loaders, bulldozers, motorized road graders and other road engineering of such world companies as «Titan», «DUNAPAC», «VOLVO», «VOGEL», «BOMAG», «Wirtgen», «Caterpillar», «Zettelmeyer», «XAMM», «XCMG», «XANOMAG», «Shantui».
History
Economy class Townhouses
Economy class Two-storey town house which includes four apartments were commissioned. The owner of each apartment has a land area of 3-4 acres with two parking spaces. The total area of the apartment is 200 square meters. On the first floor are: kitchen, living room, bathroom, entrance lobby, hall and exit to the backyard. The second floor consists of: two bedrooms (with balcony), two bathrooms, dressing room, and hall. Basement: hall, fitness room, bathroom, sauna with shower and rest room, switchboard, boiler room, pantry.
1 quarter of 2009Construction of the «Astana bypass» highway
1998 - 2001Reconstruction of the «Astana-Kostanay-Chelyabinsk» International transit corridor
2004-2008Reconstruction of the «Karasu-Bolshaya Churakovka» highway
2007 – to dateCapital repairs of the «Karabutak-Komsomolsk-Denisovka-Rudny-Kostanay» highway
2006 - to dateMiddle and routine repairs, maintenance of nationwide, district and local significance, highways, streets of Kostanay and Rudny
Capital repairs facility of the A-22 highway «Karabutak-Komsomolsk-Denisovka-Rudny-Kostanay» 307-349 km - 17.6 km completion
2015Capital repairs of the regional highway «Adaevka-Urkash-Aralkol» - 2.1 km.
In the Kostanay region
2015Middle repairs of the regional highway - 48 km
In the Kostanay region
2015Middle repairs of the nationwide highway - 30.5 km
In the Kostanay region
2015Reconstruction of the regional highway "Karasu-Bolshaya Churakovka" - 3 km
In the Kostanay region
2015Completion and commissioning of the medium repairs facility of the regional highway «Aksai-Chingirlau» - 17km
In the West Kazakhstan region
2015Medium repairs of the «Aksay-Chingirlau» highway - 25.8 km
In the West Kazakhstan region
2010Middle repairs of the regional significance highway - 13 km
In the North Kazakhstan region
2015Our address:
110000 Kostanay, Khakimzhanovna st. 7